Elevated Living, Designed Without Limits – Double Storey Home Builders
Create a home that offers space to grow, entertain, and thrive. As experienced double storey home builders, we thoughtfully design every home to maximise your block, separate living zones, and deliver striking street appeal, without compromising on comfort or functionality.

More Space. More Possibilities.
A double storey home gives you the freedom to design without compromise. Enjoy expansive open-plan living below, peaceful private retreats above, and layouts that adapt to the changing needs of your family.
Every Build With Herman home is tailored to your lifestyle, combining architectural elegance with intelligent design to make the most of every square metre.
Designed for Every Chapter of Life
Multiple living areas and spacious bedrooms designed for busy family life.
Open living spaces that flow effortlessly to alfresco areas, perfect for hosting family and friends.
Build upwards to create generous living spaces while preserving outdoor areas.
Contemporary facades and premium finishes designed to make a lasting impression.
Designed to Impress at Every Level
From grand entrances and feature staircases to light-filled living spaces and luxurious master suites, every detail is carefully considered to create a home that feels refined, functional, and built to last.
Why Build with Herman
Choosing a double storey home builder is as much about trust as it is about design. Build with Herman brings hands-on project oversight to every level of the home, from structural planning for upper-floor loads through to the finishing details that make a house feel considered rather than assembled.
- Custom double storey designs tailored to your block, not off-the-shelf templates
- Direct oversight from concept through to handover
- Experience building across metro, coastal and regional blocks – including narrow and sloping sites
- A growing portfolio of completed double storey projects, including Conway Circuit
How It Works
Consultation
We start with your block, budget and lifestyle, and talk through what a double storey layout could look like for your family.
Design & Documentation
Your home is planned, engineered for upper-floor loads, and taken through council approvals.
Construction
Ground floor, first floor, and every structural stage in between is built and inspected in sequence.
Handover
Final detailing, quality checks, and a walkthrough before the keys are yours.
Conway Circuit
Explore Conway Circuit, a thoughtfully designed double storey home showcasing architectural detail, generous living spaces, and refined finishes across every level.
Ground Floor ↔ First Floor
Move between levels to see how a double storey layout gives every part of daily life its own place — expansive living below, private retreat above.
-
Living
A generous open-plan lounge built for everyday life, framed by natural light.
-
Kitchen
A functional, connected kitchen designed as the true heart of the home.
-
Dining
A dedicated dining space that flows naturally from kitchen to living.
-
Alfresco
Indoor and outdoor living merge seamlessly, extending the home outward.
-
Bedrooms
Private, restful rooms sized and positioned for every member of the family.
-
Retreat
A private master suite set apart from the everyday, made for quiet moments.
-
Study
A quiet, considered space for work or study, tucked away from living areas.
-
Balcony
An elevated outdoor moment above the street, framing the view from upstairs.
Frequently Asked Questions
1. What are the benefits of building a double storey home?
2. Are double storey homes more expensive to build than single storey
3. Are double storey designs suitable for narrow or sloping blocks?
4. Can a double storey design be customised to suit my block and lifestyle?
5. Which areas does Build with Herman build double storey homes in?

Thinking about a double storey home for your block?
Our team can walk you through what’s possible.