Knock Down Rebuild Checklist: 7 Things to Consider Before You Build
The landscape of high-end residential architecture is undergoing a quiet, yet profound transformation
The landscape of high-end residential architecture is undergoing a quiet, yet profound transformation
Before a knock down rebuild in Geelong, check seven things: your soil classification (reactive basalt clay is common in Newtown, Belmont and Highton), whether a Heritage Overlay applies to your block (parts of Newtown and Geelong West), your realistic total budget with a 10–15% contingency, what approvals are actually required (Section 29A demolition consent, plus a planning permit in heritage areas), whether your design meets the mandatory 7-star NatHERS and Whole-of-Home 60 energy standard, how hands-on your builder actually is, and that Domestic Building Insurance is in place before signing. Getting a proper soil test and overlay check done before designing anything is the single step that avoids the most costly surprises later.
Deciding to knock down and rebuild is the easy part. What trips most homeowners up isn’t the decision itself, it’s everything they didn’t know to check before signing anything. Here’s a genuine, Geelong-specific knock down rebuild checklist covering the seven things worth sorting out before you fall in love with a floorplan.
Before any design gets drawn, your block needs a proper soil test to AS2870 standards, which classifies it from A (stable) through to P (problem/reactive). This isn’t a box-ticking formality, much of Geelong’s established suburbs, including Newtown, Belmont and Highton, sit on reactive basalt clay, which can push you well beyond a standard footing design and add real cost if it’s discovered after your budget is already locked in. Get this done early, not as a surprise mid-project.
Not every Geelong knock down rebuild needs council planning approval, but if your property sits within a Heritage Overlay, which covers pockets of Newtown and Geelong West under the Greater Geelong Planning Scheme, you’ll need a planning permit with endorsed demolition plans before you can even apply for demolition consent. Check your property’s overlay status with council before you commit to a design, since a heritage-affected block can change what’s realistically achievable on it.
A headline “build” quote almost never includes everything. Demolition, service abolishments, permits, soil testing, landscaping and a driveway typically sit outside the core build price, and it’s worth getting each of these itemised separately rather than assuming they’re bundled in. A sensible contingency on top of your total, most builders suggest somewhere around 10–15%, covers the inevitable: a soil report that comes back worse than expected, a fixture upgrade, or a variation partway through.
In the City of Greater Geelong, demolishing (or partially demolishing) a home requires council consent under Section 29A of the Building Act 1993. If you’re in a Heritage Overlay area, this sits on top of the planning permit mentioned above, not instead of it. Confirming which approvals your specific block needs, and in what order, early on avoids the common trap of applying for a building permit before your demolition consent is sorted.
Since 1 May 2024, all new homes in Victoria must achieve a 7-star NatHERS rating for the building shell, plus a Whole-of-Home rating of at least 60, which accounts for heating, cooling, hot water, lighting and any pool or spa equipment. This isn’t optional, and it affects design decisions like window placement, insulation and glazing from the earliest design stage, so it’s worth confirming your builder is building to this standard as a baseline, not an upgrade.
Most knock down rebuild projects that go badly trace back to one decision: who built it. Ask how involved the actual builder will be day to day, not just at the sales stage, and ask to see a completed project similar in scale to yours. A fixed-price, transparent quote with everything itemised, demolition, permits, site costs, contingency, is a far better signal than a low headline number with vague inclusions.
Domestic Building Insurance is mandatory in Victoria for any project over $16,000, and it protects you if your builder becomes insolvent, disappears, or fails to meet their obligations. Confirm this is in place before signing, along with what your builder’s own defects and warranty period covers after handover, this is standard, but worth confirming in writing rather than assuming.
A lot of this knock down rebuild checklist exists because most builders leave homeowners to manage it themselves.At Build with Herman, this is exactly the groundwork Herman handles personally before your design is finalised, the soil assessment, the overlay check, the sequencing of approvals, so you’re not the one chasing council departments or decoding a Section 29A consent form. With transparent, itemised costing from the outset and a single point of contact across the entire project, the goal is that this checklist becomes something we work through together, not something you’re handed to solve alone. You can see the standard of finish this hands-on approach delivers in our completed luxury projects.
Working through a knock down rebuild checklist alone can feel like a lot, especially when soil reports and overlay checks aren’t something most homeowners deal with day to day.If you’d rather have someone walk your specific block through each of these considerations with you, get in touch with Build with Herman and we’ll help you understand exactly what your knock down rebuild involves before you commit to anything.